Hampton Court Junction is the most complex part of the railway, it is where the carriage shed and locomotive sheds are located. The railway grows from 2 tracks to 4 parallel tracks for access to the Tunnel and Alps sections of the railway line.
Control of this area will be provided by the new Hampton Court Jct signal
box, which is currently being fitted out
The signalling in this area uses 4 aspect coloured light signals.
Please follow the Hampton Court Jct. in the left menu for comprehensive signal box details. |