mdsme rolling logo
spacer
Miscellaneous
Westinghouse Lever frame header picture
General | Stages | Stage 1 | Stage 2 | Stage 3 | Stage 4 | Stage 5 | Stage 6
Stage 5 - Alps Line Junction
Implement control of the Alps Line Junction
Comprising 1 set of points, 2 coloured light signals, and 1 associated shunt signal.
Track diagram of area of stage 5 works
Track diagram of area of stage 5 works
This stage works involves implementation of the lever functions to the track side infrastructure as outlined in the diagram above. The tunnel signal on the left is excluded from this stage works as it is implemented in stage 6.
Last modified:
Copyright © 1997 - 2008 Malden and District Society of Model Engineers Ltd