mdsme rolling logo
spacer
Miscellaneous
Westinghouse Lever frame header picture
General | Stages | Stage 1 | Stage 2 | Stage 3 | Stage 4 | Stage 5 | Stage 6
Stage 3 - HCJ Maintenance Shed junction
Implement control of the Maintenance Shed junction
Up to the roundhouse junction signal gantry. {in stage 2}
This includes North Pole Station area and siding.
Comprising 2 sets of points, 2 coloured light home signals, and 4 associated shunt signals
Track diagram of area of stage 3 works
Track diagram of area of stage 3 works
This stage works involves implementation of the lever functions to the track side infrastructure as outlined in the diagram above. The 3 x 4 aspect signal No's 36,46,47 on the left are excluded from this stage as they would be completed in stage 2.
Last modified:
Copyright © 1997 - 2008 Malden and District Society of Model Engineers Ltd